Ford Sharonville 700,000-square-foot transmission plant
At a glance
Company:
Industry:
Service:
ÌÇÐÄÊÓÆµ Site Management associates from the Toledo and Lima offices performed concrete and utility work in Ford’s 60-year-old transmission plant.
Rudolph ÌÇÐÄÊÓÆµ Inc. managed concrete demo, removal and placement sub-base for approximately 700,000-square-feet of existing slab.
GEM Inc. managed underground piping and electrical grounding. Demolished concrete is being crushed for reuse onsite. Rudolph ÌÇÐÄÊÓÆµ Inc. and GEM are coordinating closely to ensure schedule milestones are met in numerous work areas.
The ÌÇÐÄÊÓÆµ crews worked in an operating facility where dust and vibration control had to be continuously maintained. The project met with safety and reliability success due to the number of ÌÇÐÄÊÓÆµ resources, equipment and manpower, working in an operating facility, with zero safety incidents and no downtime.